Maldron Hotel

Shortlisted for Project of the year 2020 ICE (Irish construction excellence) awards, the recently renovated hotel in Parnell square consists of 182 bedrooms which are fully air conditioned. The project consisted of the construction of a 6th floor addition to the hotel and the renovation and build of existing Georgian buildings beside the existing hotel. The roof plantroom systems were removed from the roof and a new plantroom was constructed in the basement. The overall construction lasted for 17 months.

Client: Dalata Group
Main Contractor: Townmore Construction
Design Consultant: EDP
Architect: Douglas Wallace
Certification: BCAR

The Mechanical scope of works consisted of the following:
  • Central boiler house
  • Central ventilation systems
  • Plumbing systems
  • Fire smoke damper installations
  • BMS
  • Fire Protection
  • Comms Room Installation